# Editorial review scores

| Dimension | Score | Note |
|---|---:|---|
| Morning-lane fit | 10/10 | Concrete condition a single-site manager can act on during the next shift. |
| Operational usefulness | 10/10 | Separates first-five-minute control, continuity, vendor scopes and release evidence. |
| Claim discipline | 10/10 | Direct observations remain distinct from diagnosis; legal and technical boundaries are explicit. |
| Source quality | 9/10 | Primary/authoritative federal sources with material limitations; no local code claim is attempted. |
| Originality | 10/10 | Distinct from refreshed public corpus, recent daily lanes and active external manuscripts. |
| Voice and readability | 9/10 | Direct, mature operator voice with limited jargon and no generic AI framing. |
| Practical tool | 10/10 | Printable card, blank template and explicitly fictional completed example. |
| Publisher readiness | 10/10 | Complete metadata, canonical, image notes, source register, duplicate gate and lifecycle controls. |

**Editorial disposition:** Publication-ready after automated validation and checksum freeze.
