# Jared personal authority site publisher manifest

## Assignment

- **Destination prerequisite:** `destination-assignment.md` was created first on 2026-09-05.
- **Selected owned publisher:** Jared's personal authority site only
- **Publisher owner:** Jared Mastroianni
- **Author:** Jared Mastroianni
- **Article:** *Your Pilot Passed. Your Portfolio Hasn't: A Facility Cohort Gate for Multi-Location Self-Storage*
- **Proposed slug:** `facility-cohort-release-gate-self-storage`
- **Proposed canonical:** `https://jaredmodstorage.github.io/writing/facility-cohort-release-gate-self-storage/`
- **Primary article file:** `roll-out-by-evidence-not-optimism.md` — 1,724 body words under the documented body-marker Unicode-token rule with footnote markers excluded
- **Practical tool:** `facility-cohort-release-gate.csv`
- **Source register:** `source-register.csv`
- **Featured image:** `028-professional-board-strategy-conversation.png`

## Exclusivity and duplicate control

- Jared's personal authority site is the only assigned owned publisher for the complete title, slug and body.
- The modSTORAGE WordPress blog must reject the same complete article, title, slug or body as a duplicate.
- A future modSTORAGE companion requires a materially different title, thesis, structure, examples, practical tool and wording.
- Temporary syndication is allowed only as a transparent correction with a visible source note and cross-domain canonical to the original. It must not be represented as a distinct release.

## Proposed publication fields

- **SEO title:** Facility Cohort Release Gates for Multi-Location Self-Storage
- **Meta description:** Move an approved operating change through bounded facility cohorts using explicit entry, observation, stop, recovery and expansion evidence.
- **Excerpt:** Portfolio-wide is a scope, not a deployment method. Use a facility cohort gate to limit exposure, observe real work and expand only after reconciliation.
- **Suggested tags:** self-storage operations; multi-location management; change management; operating systems; rollout governance; portfolio operations
- **Image alt text:** Jared Mastroianni listens during an AI-generated boardroom discussion about a multi-location operating rollout.
- **Image caption:** A portfolio rollout should advance when the prior facility cohort has reconciled, not simply when the calendar says go. AI-generated editorial illustration; not documentary evidence of a meeting, facility, employee, deployment or result.
- **Tool label:** Download the Facility Cohort Release Gate

## Claim and state boundaries

- Granite Loop Storage, all named sites, roles, systems, timestamps, evidence links, changes and results are explicitly fictional.
- No customer, facility, rollout, deployment, product, vendor, performance, revenue, occupancy, adoption, safety, compliance, certification, award, coverage or recognition result is claimed.
- The package is a publication-ready local draft. No publisher handoff, repository change, CMS entry, schedule, publication, canonical activation, feed or sitemap inclusion, crawl, indexing, ranking, external coverage or recognition occurred.
