# Source register — climate-controlled unit complaint

Accessed September 20, 2026. These are public primary/authoritative sources for limited building-operations statements, not evidence about any modSTORAGE facility, contractual climate promise, customer complaint, equipment installation or repair. The unit-level response sequence and field record are Jared's authored operating method.

| ID | Source | Used for | Limitation |
| --- | --- | --- | --- |
| CLM-01 | U.S. Environmental Protection Agency and National Institute for Occupational Safety and Health, [*Building Air Quality Guide: A Guide for Building Owners and Facility Managers*](https://www.epa.gov/indoor-air-quality-iaq/building-air-quality-guide-guide-building-owners-and-facility-managers), official EPA page updated August 6, 2026; live web readback September 20, 2026. | Occupant complaint information, investigation using HVAC/system data, hypothesis testing, communication and problem closure are recognized building-management tasks. | Commercial/public-building indoor-air-quality guide; not a storage-unit performance standard, customer agreement, legal conclusion or site-specific procedure. The article adapts the investigative structure, not its forms or text. |
| CLM-02 | U.S. Department of Energy, [*Energy Savings Potential and RD&D Opportunities for Commercial Building HVAC Systems*](https://www.energy.gov/sites/default/files/2017/12/f46/bto-DOE-Comm-HVAC-Report-12-21-17.pdf), December 2017; official PDF live web readback September 20, 2026. | Commercial systems may use thermostats or multiple zone sensors; the meaning and location of a displayed reading need to be identified. | Technology survey, not current facility equipment documentation, a claim that a particular unit uses a zone sensor, or a prescribed measurement method. |
| CLM-03 | U.S. Environmental Protection Agency, [*Moisture Control Guidance for Building Design, Construction and Maintenance*](https://www.epa.gov/indoor-air-quality-iaq/moisture-control-guidance-building-design-construction-and-maintenance-0), official page updated April 13, 2026; live web readback September 20, 2026. | Moisture-control operation and maintenance includes HVAC and verification work; visible condensation merits a separate investigation from an air-temperature complaint. | General building guidance, not a mold diagnosis, unit-level humidity promise, numerical self-storage target, customer-damage finding or repair authorization. |

No statistics, specific temperature or humidity range, customer outcome, model performance, certification, deployment or product-availability assertion appears in the article. Weather and sensor examples are conditional or explicitly fictional. The customer promise must be taken from the actual agreement/public representation at the facility, not these general sources.
